Album: Bathroom Before and After
Date: 11/16/2005
Owner: Sharon
Size: 16 items
Views: 2066
|
Album: Week 12 and Beyond
Bedroom closet is done as part of the project, painting and staining of bathrooms and new doors.
Date: 11/12/2005
Owner: Sharon
Size: 7 items
Views: 735
|
Album: Bathroom Renovation: WEEKS 10&11
No description
Date: 08/02/2005
Owner: Sharon
Size: 17 items
Views: 1551
|
Album: Bathroom Renovation: WEEK 9
Tile work continues, some additional electrical work occurs
Date: 07/26/2005
Owner: Sharon
Size: 14 items
Views: 1293
|
|
Album: Bathroom Renovation: WEEK 8
Cam the tile installer is here...and we finally get a working shower!
Date: 07/19/2005
Owner: Sharon
Size: 15 items
Views: 1401
|
Album: Bathroom Renovation: WEEK 7
Mostly waiting for the tile installer to be available the following week, but we did get light in both bathrooms.
Date: 07/16/2005
Owner: Sharon
Size: 5 items
Views: 790
|
Album: Bathroom Renovation: WEEK 6
The plasterer finished the walls and ceiling. The bathrooms are looking like real rooms again!
See latest photos
Date: 07/05/2005
Owner: Sharon
Size: 24 items
Views: 1648
|
Album: Bathroom Renovation: WEEK 5
Insulation at last! Walls should be plastered by end of week or early next week.
Date: 06/29/2005
Owner: Sharon
Size: 10 items
Views: 1007
|
|
Album: Bathroom Renovation: WEEK 4
There's a bathtub now, although it's not actually installed yet....
Date: 06/23/2005
Owner: Sharon
Size: 9 items
Views: 1043
|
Album: Bathroom Renovation: WEEK 3
A working toilet at last! However, a shower is still many weeks away.
Date: 06/14/2005
Owner: Sharon
Size: 8 items
Views: 860
|
Album: Bathroom Renovation: WEEK 2
What we came home to after our vacation
Date: 06/10/2005
Owner: Sharon
Size: 9 items
Views: 793
|
Album: Demolition!
Thanks to Bev & Brian who took these photos of the demolition week while we were away
Date: 06/10/2005
Owner: Sharon
Size: 12 items
Views: 1021
|